The Construction waste disposal project is located in the Far East of Russia. The undertaking unit is a building materials company engaged in construction waste recycling products, municipal road engineering products, and building wall materials. Primary-level resource utilization is an ideal resource-based method for construction waste disposal, and recycled aggregates from construction waste are an important part of primary-level resource utilization, which has good economic benefits and important social significance.
Processing materials: brick mixed construction waste
Output: 180T/H
Feed particle size: 0-650mm
Discharge particle size: 0-50mm
On-site situation
The equipment adopts the iconic product I44 counter-crushing crawler mobile crushing station, and the material is processed by the main equipment counter-breaking to produce sand and gravel aggregates below 50mm.The counter-breaking adopts 4 sets of plate hammer rotors and a wide crushing chamber, which compresses the space as much as possible on the basis of ensuring high crushing capacity, and the plate hammer can be directly hoisted out, which is very convenient.