Gold Refining Plant for Sale – Maximize Purity & Profitability
Struggling with Low-Yield, High-Cost Gold Refining?
Are outdated refining methods eating into your profits? Inconsistent purity, slow processing, and high operational costs plague traditional systems. Our state-of-the-art gold refining plant delivers 99.99% purity, faster throughput, and lower waste—ensuring maximum ROI for mines, refineries, and recyclers. .jpg)
How Does Our Gold Refining Plant Work?
A fully automated, closed-loop system designed for efficiency:
- Feedstock Preparation: Crushed ore or scrap gold is dissolved using eco-friendly reagents.
- Chemical Purification: Advanced solvent extraction removes base metals (Cu, Ag, Pb).
- Electrolytic Refining: High-purity cathodes produce 24K gold bars (>99.99%).
- Slag & Waste Recovery: Zero-discharge design captures residual metals for resale.
Why Choose Our Gold Refining System?
| Feature | Advantage |
|---|---|
| Modular Design | Scalable capacity (1–100 TPD) with minimal downtime for upgrades. |
| Hybrid Energy Use | 30% lower power consumption vs. conventional electrolytic systems. |
| Closed-Loop Chemistry | EPA-compliant; reduces reagent costs by 40%. |
| Real-Time Analytics | IoT sensors optimize process variables for peak efficiency. |
Competitive Edge: Outperforms traditional aqua regia methods with higher recovery rates (98% vs. 92%) and no hazardous fumes.
Technical Specifications
- Capacity: 1–100 tonnes per day (customizable)
- Power: 150–3,000 kW (depending on model)
- Materials: Corrosion-resistant titanium reactors, ceramic filters
- Purity Output: 99.99% Au (meets LBMA standards)
- Footprint: Compact design – 50% smaller than comparable units
Who Benefits from This Plant?
Application Scenarios:
- Large-Scale Miners: Process doré bars onsite to cut transport/logistics costs.
- E-Waste Recyclers: Extract gold from PCBs with <5% material loss.
- Case Study: A Ghanaian mine increased annual revenue by $2M after upgrading to our 20-TPD system (18-month payback period).
Investment Options & Pricing
Flexible solutions tailored to your budget: 
- Full CAPEX purchase: $1M–$15M (volume discounts available).
- Lease-to-own financing: Spread payments over 3–5 years at competitive rates.
- Request a custom ROI analysis based on your feedstock volume.
Frequently Asked Questions
What’s the typical installation timeline?
6–12 weeks post-order (includes training and commissioning).
Can the plant handle silver/PGMs?
Yes – optional modules recover Ag, Pt, and Pd simultaneously.
How is waste handled?
Neutralized slag is safe for landfill; we provide compliance documentation globally.
What maintenance is required?
Automated self-cleaning reduces manual labor to <4 hours/week per shift.




